Welcome to Dongguan Sewing Machinery Equipment Co., Ltd.

Needle sewing machine

news

Hot keywords

Contact us

Dongguan Industrial Sewing Machine Co., Ltd

Contact: Mr. Han

Tel: 0769-83212620

Mobile: +8615322917376

WhatsApp: +8613684912620

Mailbox: Gfzc@dggfzc.com

Fax: 0769-83212620

Address: No. 154, Qiaonan Road, Third Industrial Zone, Houjie Town, Dongguan City, Guangdong Province, China

Website: www.dggfzc.com

Website :   en.dggfzc.com




Is the daily maintenance method of the computer controlled hand boxed charter aircraft simple?

Your current location: Home >> News >> Industry News

Is the daily maintenance method of the computer controlled hand boxed charter aircraft simple?

Date of release:2019-01-09 Author: Click:

1547023131793757.jpg

A boxed charter can be a great help to you if it can be well maintained and used for a long time. Therefore, we should use and maintain the sewing machine reasonably so that it can be used for a longer period of time and create more value for us.

First, the clearing trilogy of the box charter

1, tooth cleaning check the screw between the needle plate and the cloth tooth, remove cloth hair, dust, and add a small amount of sewing car oil.

Other parts of the cleaning machine surface and the panels of all parts should be regularly cleaned up.

The cleaning of the shuttle bed is the core of the work of the sewing machine and is the most prone to failure. Therefore, it is necessary to always be clear about the dirt and add a small amount of needle oil.

Second, it should be lubricated and lubricated in these parts of the box carrier.

1, the oil holes on the head, lubrication of the upper shaft and the upper shaft connected parts.

2, the movement of the lower part of the machine plate clean and less oil.

3, the internal parts of the panel and the components connected to the moving parts. Lubricate the pin and pin rods and the parts attached to them.

Before using the box chargers, please clean up the chargers, clean up the dust accumulated in the delivery, confirm that the voltage set is correct and the power plug is inserted correctly. In addition, when the power supply specifications are different, Please do not press the red power switch to start it to work, in case the computer box burn report fee. If there is an alarm error code should be shut down in time, check whether the power supply is correct, there is no jam situation, after these circumstances are ruled out, the alarm error should be promptly called maintenance personnel for maintenance.


The address of this article:http://www.dggfzc.com/news/404.html

Key word:BindBindMachine,Boxedcharteraircraft,Needlesewingmachine

Recently browse:

  • Service
  • number
    13684912620
  • Message
  • Online Service
    Please leave a message for us
    Please input the message here, and we will contact you as soon as possible.
    name
    Contacts
    Telephone
    Telephone
    mailbox
    mailbox
    address
    address